Roof Deicing with ZMesh - Dual Systems - 369 to 430 Sq. ft
Part Number:
ZRD23-250-2
Coverage:
369-430 square feet
Power Requirements:
240 V 30 AMP
Description:
Roof Deicing Systems with ZMesh
ZMesh
may be installed under any non conductive shingle and can be screwed,
stapled or nailed through privided the nails, staples or screws do not
come in contact with anything electrically conductive. Proper
installation requires that ZMesh be completely covered with ice and
water shield. Kits include a 12 Hour Timer, Gutter or Air Sensing
Temperature and Moisture sensor, Transformer, Control Box, 2 - 9" ZMesh Rolls,
and a Rough-In Kit with 100' of Cold Lead.
